인체 드로잉 및 크로키 연습을 위한 웹사이트 모음
- 유용한사이트
- 2023. 9. 10.
인체 드로잉 및 크로키 연습을 위한 웹사이트 모음
다양한 인체 포즈, 빠른 스케치 연습을 위한 타이머 기능, 360도 회전하는 3D 모델, 얼굴 표정 레퍼런스등을 제공하는 웹사이트 모음
1)quickposes
https://quickposes.com/en
Quickposes
Free image library and gesture drawing tool for artists
quickposes.com


2)posemaniacs
https://www.posemaniacs.com/ko
POSEMANIACS - Royalty free 3d pose reference for all artists
Posemaniacs.com is a royalty free pose reference for all artists. Our mission is “to create free learning materials for all people who want to be an artist.” We are small teams it would be great if you are happy to help us.
www.posemaniacs.com





3)croquis.cafe
https://croquis.cafe/
Croquis Cafe
Art model reference photos for fine artists.
croquis.cafe


4)line-of-action
https://line-of-action.com/
Line of Action
What an oversight! I recently realized that I forgot to release the 360 photos of Alex that we took months back. Today, we rectify that -- there are now 45 Alex poses available to look at in 360 degrees. Continue reading → Based on your requests, I added
line-of-action.com



5)lovelifedrawing
https://www.lovelifedrawing.com/
Love Life Drawing: Become Confident with Figure Drawing
https://youtu.be/5T99JiMZ59c During your journey of learning to draw the figure, you’ll probably have pivotal, memorable moments. Maybe it’s a drawing that felt like a turning
www.lovelifedrawing.com

'유용한사이트' 카테고리의 다른 글
| 소규모 기차 철도 모형(Train Railway Model) 및 모델링 커뮤니티 사이트 모음 (0) | 2023.10.18 |
|---|---|
| 드로잉 및 디지털 페인팅 튜토리얼 웹사이트 모음 (0) | 2023.09.11 |
| 디자인 어워드 웹사이트 목록(제품, 웹사이트) (0) | 2023.09.08 |
| 3D 자연물 모델 다운로드 및 구매할수있는 웹사이트 모음(나무, 잔디, 바위, 기타) (0) | 2023.07.24 |
| 구글(google)의 크롬 뮤직랩(Chrome Music Lab) (0) | 2023.07.11 |